Phase 3 Updates

Parking Lot View
Patio
Entry Door
Hallway
Living Area in Unit
Stairs
Hallyway
Parking Lot
Fence Complete – South View
Elevator
Bistro Entrance
Living Area
2 Bedroom
Sidewalk Cement
North Side
Parking Lot
Chess Inlay Bistro Patio
Patio
Evening Parking Lot with Lights
Canopy Top View
Canopy Entrance
South Side View With Fence
South Side
Parking Lot
Suite Hallway
Living Room Window
Bathroom Vanity
Kitchen Cabinets
Suite
Drywall
Bird’s Eye View
Drywall
Southside View
Floor
Crane
Streetview
Hallway
Side Door
Drywall
Insulation
Bedroom
Drywall
Hallway
Exterior
Yard Site
Elevator
Hallway
Yard Site
Suite
Drywall
South Side
North Side
Third Floor Hall
Interior Framing
Window Installs on the South Side
Third Floor Hall
Interior Framing with Window Install
Back Side View
Front View
Building on April 17, 2020.
Rafters going up.
Third Floor Phase 3.
Suite.
Stairwell.
Suite.
Suite Hall.
First Floor Patio
First Floor Suite
Bird’s Eye View
First Floor Suite
Ground View
Street View